Our clients

Filter realisations:
07/12/2018

Zexi, Shijiazhuang

4 MWp, with an annual production of over 4.65 million kWh

Over 13,000 solar panels with a capacity of 4 MWp, to be constructed in less than 60 days. That was the challenge. The entire installation was...

read more
05/12/2018

Hongcheng, Hebei

A 1.2 MWp PV installation. Annual electricity production: 1.5 million kWh

A 1.2 MWp PV installation at a steel factory in the province of Hebei (China). Constructed in less than one month and producing 1.5 million kWh...

read more
28/08/2018

Hengjiang, Shijiazhuang

1.6 MWp, over 1.7 million kWh produced per year.

In the southern province of Zhejiang, EnergyVision installed a 1.6 MWp PV installation divided between 2 different roofs. The installation was...

read more
22/05/2018

JISI, Chenzhou

1.5 MWp

Over 1.8 million kWh generated per year

In southern China, in the middle of the rainy season in May 2018, we installed 1.5 MWp in just one month at this glass manufacturer. The...

read more
30/04/2018

Holiday Inn, Tianjin

Complete LED relighting in phases.

Saves a good 200,000 RMB per year.

The Holiday Inn is counting on Energy Vision for phased replacement of all the lighting in the hotel ‘Holiday Inn Aqua City’ in downtown Tianjin...

read more
15/02/2018

Bekaert Deslee, Wuxi

LED-relighting

Annual saving of a good 150,000 kWh

At the Bekaert Deslee warehouses in Wuxi (near Suzhou in southern China), EnergyVision replaced all the old mercury vapour lamps with high...

read more