Another EnergyVision project: Airbus, Beijing

Name of client

Airbus

Key figures for the installation

2,000m² ProFilm
Annual saving of 275,559 kWh

Location

Beijing, China

Brief description of the project

Airbus has highly transparent working methods. Literally, in the case of their regional head office in Beijing. The building is made almost entirely of glass. As a result it gets extremely hot inside in summer and the air conditioning has to work overtime. We installed thermal window film to keep out the heat.

See what happened to the client’s building

(You don’t see any difference? That’s right! ProFilm is super efficient but also totally invisible)

ProFilm has enabled us to lower the temperature by more than 10°C. The EnergyVision team installed the film outside office hours and even worked through the Christmas holidays: fantastic service and flexibility!

Mr. WangFacility Manager at Airbus, Beijing

A few images of the site

Many thanks for your confidence in us, Airbus!